client objectives
Plug hole in tank and ensure no leaks.
Tank can be drained down for maximum 90 minutes
Products must cure within a short time frame

Scope of works
AQL carried out waterproofing and active water stopping methods, including: Plugging hole- A rapid setting, waterproof, cementitious mortar solution was installed to fill the large hole. This solution goes hard within minutes and was the ideal solution to complete this repair, while causing minimal disruption to the plant. Due to this products extreme strength, this product will stand up to the test of time. Crack Injection- The cold joint between the new repair and the host concrete was then resin crack injected to ensure this joint could not allow water to exit the tank. Gasket Plate- A stainless steel plate with a rubber gasket to create a seal was then mechanically fixed over the repaired area as an extra precaution.