RNLI Berthing Station, Isle of Mull, Scotland

client objectives

Ensure the longevity and structural integrity of the structure Apply protective coatings which will resist the adverse weather conditions the structure is exposed to. Ensure no pollution to the sea during works.

Scope of works

AQL carried out a restoration and protection measures, including: Encapsulation and Scaffolding: A full scaffolding encapsulation was built to contain all the debris created, stopping pollution to the water and air. A scaffolding platform was constructed to allow for operatives to carry out the work in an efficient and safe manner. Surface Preparation: All of the steel was shot blasted to remove the existing coating and any debris. Shot blasting was all done to SA 2.5 as per paint suppliers recommendation. Primer- A primer was applied as part of the paint system to allow for the best compatibility for the protective coating. Protective Coating- A C5 classified protective coating system was applied to protect the structure from erosion from salt water, waves, storms and adverse weather

FAQs

projects

Sectors

Adrian Queally Ltd (AQL) has extensive experience and technical knowledge ranging across the following sectors. We provide clients with Bespoke systems, Competitive pricing, Excellent Customer service, Timely and successful project delivery.