client objectives
Ensure the longevity and structural integrity of the concrete.
Ensure the system prevents any water ingress
A finished product that can stand up to the traffic, fuel/oil spills and load bearings
A system that allows grip for vehicles and pedestrians.
A line marking system to highlight parking spaces and walkways

Scope of works
AQL carried out a restoration and protection measures, including: Surface Preparation: The entire area was diamond grinded to remove the old coating and to prepare a suitable bonding surface for the application. A deep clean then took place to get rid of any debris from grinding and to remove any dust from the area. Waterproofing System- The flexible, epoxy, waterproof system was then applied over the area to seal the roof of the structure. Highlighted Areas- Walkways were installed to segregate people and vehicles, while line marking was installed to make car parking spaces.